AI in construction: 78 jobs Claude can take on

A UK construction contractor can use AI to draft the tenders, method statements and variation letters that keep its people from building. This page lists 78 use cases, led by tenders (10) and method statements and safety (9). Get AI Powers Ltd, a UK firm that sets Claude up inside businesses and trains their people, wrote it.

This page lists the jobs inside a UK construction contractor or specialist subcontractor that AI can take on, broken down by the part of the business that does them. It is written for owners and directors of firms of 10 to 250 people, and it starts with the documents that take your estimators, quantity surveyors and contracts managers away from pricing and building: the tender response, the method statement and the variation letter.

All 78 use cases on one page, to print and tick off with your team.
[WHERE THE TIME GOES]

Where the time goes

These are the tasks that come round on every tender, every job and every month in a contractor or specialist subcontractor of 10 to 250 people, grouped by the kind of work they are.

01

Rewriting documents from the last job

6 tasksClose
  • The quality answers for this tender
  • The method statement and risk assessment for each package
  • The construction phase plan
  • Case studies and CVs in each client's format
  • Subcontract orders from your standard terms
  • The O&M manual at the end of the job
02

Turning what happened on site into a record

6 tasksClose
  • Site instructions into variation letters
  • The site diary into the weekly report
  • Delays into notices before the time limit
  • Daywork sheets into a priced record
  • Progress meetings into minutes and actions
  • Accidents into an investigation report
03

Pulling numbers together from several places

6 tasksClose
  • Supplier and subcontract quotes into one comparison
  • Progress and variations into the monthly application
  • The payment notice against what you applied for
  • Valuations and costs into the monthly CVR
  • Timesheets into payroll and job costs
  • Subcontractor payments into the CIS return
04

Chasing people for what they owe you

6 tasksClose
  • Suppliers for quotes before the tender deadline
  • Subcontractors for insurance, RAMS and cards
  • Designers for answers to RFIs
  • Clients for payment and retention
  • Trades for snags and O&M information
  • Operatives for expired cards and tickets
[THE POINT]

What a contractor does brilliantly, and what sits around it

This is the point of the whole page. The work in the left column is why clients give you the job. The work in the right column has grown up around it, and in most firms it is done in the evenings by the people you most need on site and on the price.

What a human does brilliantly
  1. Deciding which jobs are worth chasing
  2. Setting the price and the margin
  3. Spotting the risk hidden in a contract
  1. Planning a safe way to do the work
  2. Running a site and the people on it
  3. Negotiating the variation and the final account
  4. Keeping the main contractors who give repeat work
  5. Knowing which subcontractors will turn up
  6. Judging the standard of the finished work
  7. Telling a client the programme has slipped
What sits around it
  1. Copying quality answers from the last bid
  2. Retyping quotes into a comparison
  3. Changing the site name on last month's RAMS
  1. Writing up the site diary
  2. Turning instructions into variation letters
  3. Building the application in a spreadsheet
  4. Chasing subcontractors for their insurance
  5. Filling in the same supplier questionnaire
  6. Assembling the O&M manual
  7. Working out the CIS deductions

The use case for AI is taking away the time that gets spent on the work sitting around the job, and freeing your people up to do the work only a human can do. The work that grows the business, and the work they enjoy the most.

[THE USE CASES]

78 things you could hand over, by function.

The times are our own estimates for a contractor or specialist subcontractor of 10 to 250 people. Nobody has published measured times for this work, so treat them as a starting point and put your own into the calculator. The highlighted use cases either take the most hours or make the biggest difference to margin and cash.

Winning work and tenders

Enquiries, quality submissions and the bid that goes in on Friday.

10 use cases

Keeping the tender list up to date

Reads every enquiry and invitation that arrives by email or portal and keeps one list of what is out, what it is, who it is for and when it is due back.

Scheduled taskConnectorEmailBid portalSpreadsheet
Scheduled taskConnectorEmailBid portalSpreadsheet
You give itRead access to the estimating inbox and the portals you are registered on, and your current tender list.
You get backA list each Monday of every live enquiry with its return date, value band, form of contract and client, with the ones due in the next 10 days at the top and any return date that has moved marked.
You stillDecide what goes on the list as a bid and what you decline. The list keeps the dates in front of you, and choosing the work is the director's call.
Highest value

Reading the enquiry pack for what matters

Reads the whole tender pack, from the preliminaries to the contract amendments, and pulls out the points that decide whether and how you price it.

ProjectSkillFile storageBid portal
ProjectSkillFile storageBid portal
You give itThe enquiry pack: drawings list, specification, preliminaries, form of contract and amendments, pre-construction information and the tender return form.
You get backA 2 page summary of scope, programme, contract terms, payment and retention, damages, design responsibility and anything unusual, with the page reference for each point and a list of what the pack does not say.
You stillWeigh the risk and decide whether to bid. The summary points you at the clauses, and reading the important ones properly is still your job.

The bid or no-bid record

Scores an enquiry against the criteria you set, such as client, value, location, workload and contract terms, so the decision is written down the same way every time.

SkillSpreadsheetFile storage
SkillSpreadsheetFile storage
You give itYour scoring criteria, the enquiry summary and the current order book.
You get backA one page record with each criterion scored, the evidence for each score, and how this enquiry compares with the last 10 you bid and won or lost.
You stillMake the call. A low score is a reason to look harder, and a client you want to work for can be worth bidding anyway.
Highest time

Drafting the quality submission

Writes first drafts of the quality answers for this tender, built from your best answers to past bids and fitted to this client's questions, scoring guide and word limits.

ProjectSkillFile storageBid portal
ProjectSkillFile storageBid portal
You give itThe quality questions and scoring guide, your library of past submissions and their scores, and your notes on how you would run this job.
You get backA draft answer for every question, inside each word limit, using this project's name, site and programme, with each point mapped to the scoring criteria and the places where you need to add a project specific detail marked.
You stillPut in the thinking that wins it: how you would build this job on this site. The draft carries what is true of every job, and the evaluator scores what is true of this one.

The tender method statement and programme narrative

Writes the method statement and programme narrative that go in with the tender, describing the sequence, the logistics and how you will handle the site's constraints.

ProjectSkillCADProject managementFile storage
ProjectSkillCADProject managementFile storage
You give itThe drawings, the site information, the client's programme and your notes or a sketch of the sequence and logistics.
You get backA tender method statement in the client's format covering sequence, access, deliveries, temporary works, neighbours and key risks, with a narrative that matches the programme you are submitting.
You stillDecide the sequence and the logistics. The statement only describes the plan you chose, and it should be one your contracts manager recognises when the job starts.

Tender queries to the client

Finds the gaps and conflicts in the tender documents, such as a drawing that disagrees with the specification, and drafts the queries before the deadline for questions.

ProjectBid portalFile storage
ProjectBid portalFile storage
You give itThe drawings, specification and preliminaries, and any queries and answers already issued.
You get backA numbered list of queries with the document and clause each one refers to, written to be sent through the portal, and a log for recording the answers as they come back.
You stillChoose which queries to raise. Some gaps are better priced as a qualification than asked about, and that is a judgement about the client and your competitors.

Qualifications and clarifications

Drafts the list of qualifications and clarifications that goes with your price, from the estimate's assumptions and the gaps found in the pack.

SkillQuoting toolFile storage
SkillQuoting toolFile storage
You give itThe estimator's assumptions and exclusions, the enquiry summary and your standard qualifications.
You get backA clean list of qualifications and clarifications in plain contract language, each tied to the document it relates to, and a note of any that the tender instructions say will be treated as non-compliant.
You stillDecide what you are willing to carry. The list sets the boundary of your price, and if the boundary is wrong the margin goes with it.

Case studies and CVs fitted to each bid

Picks the past projects and people that match this tender and rewrites the case studies and CVs to the client's format and length.

ProjectFile storagePhotos
ProjectFile storagePhotos
You give itYour library of project write-ups, photos and staff CVs, and the tender's requirements for experience and team.
You get backThe 3 or 4 most relevant case studies and the proposed team's CVs, each cut to fit, with the value, contract form, client and outcome of every project stated the same way.
You stillCheck every claim is true and that the people named will actually be on the job. Evaluators remember who turned up.

The social value answer

Drafts the social value response for a public sector tender from what your firm actually does locally, in the buyer's own measures.

ProjectSkillProcurement portalFile storage
ProjectSkillProcurement portalFile storage
You give itThe buyer's social value questions and measures, and your records of local labour, apprentices, local spend and community work on past jobs.
You get backA draft answer with commitments written as measurable targets for this contract, backed by what you delivered on earlier jobs, and a list of commitments the draft avoids because you have no record of doing them.
You stillCommit only to what you will deliver and report on. Social value promises are checked during the contract, not just scored at tender.
Highest value

Learning from the tenders you lost

Reads the feedback and scores from tenders you lost and won, and shows where your answers keep dropping marks. Under the Procurement Act 2023 public buyers give bid assessments for final tenders.

ProjectProcurement portalFile storage
ProjectProcurement portalFile storage
You give itThe feedback letters, scores and assessments from the last year of tenders, and the answers you submitted.
You get backA short report on which questions you lose marks on, what the winning bids were praised for where the buyer said, and the answers in your library that need rewriting.
You stillDecide what changes. The pattern in the scores tells you where to spend your effort, and whether to chase that kind of work at all.

Prequalification

Scheme renewals and the same questions from every new client.

5 use cases
Highest time

Answering a client's supplier questionnaire

Fills in a new client's or main contractor's supplier questionnaire from your policies, accounts, insurances and past answers.

ProjectSkillPrequalification databaseFile storage
ProjectSkillPrequalification databaseFile storage
You give itThe questionnaire, your policies, insurance schedule, latest accounts, scheme certificates and past completed questionnaires.
You get backEvery question answered from your own documents with the source of each answer noted, the attachments listed in the order the form asks, and the questions with no evidence behind them marked.
You stillSign the declaration. You are telling a client your firm is competent, and CDM 2015 requires the person appointing you to take reasonable steps to check exactly that.

Renewing your accreditation schemes

Prepares the evidence for each scheme renewal, such as your health and safety and Common Assessment Standard assessments, from what changed since last year.

ProjectScheduled taskPrequalification databaseFile storageCalendar
ProjectScheduled taskPrequalification databaseFile storageCalendar
You give itLast year's submissions, the scheme's current questions, and this year's policies, accident records, training records and accounts.
You get backA renewal pack per scheme with the changed answers marked, the evidence files named as the assessor asks, and a calendar of every scheme's expiry date.
You stillReview the policies themselves once a year and sign them. An assessor checks the paperwork, and your sites show whether you follow it.

Keeping your policies current

Checks your health and safety, environmental, quality, equality and modern slavery policies for out of date names, dates and references, and drafts the updates.

ProjectFile storage
ProjectFile storage
You give itYour current policies and the changes in the business since they were last signed, such as new directors, new services or a new office.
You get backEach policy with the changes tracked, a note of anything that no longer matches how the firm works, and a list of which clients and schemes need the new versions.
You stillAgree what the policies commit the firm to, and sign them as a director. A policy you do not follow is evidence against you.

Applying to join a framework

Drafts a framework application, which asks the same things as a tender at greater length, from your library of answers and evidence.

ProjectSkillProcurement portalFile storage
ProjectSkillProcurement portalFile storage
You give itThe framework documents and questions, your past framework and tender answers, and your financial and accreditation evidence.
You get backA first draft of every section, a checklist of the documents required with the ones you hold and the ones you do not, and the deadlines in the order the portal asks for them.
You stillDecide whether the framework is worth years of your time, and write the answers about how you would serve this buyer. The draft handles what is the same for every buyer.

Your supplier details for public tenders

Gathers and checks the core business details public buyers ask for, so the record you keep on Find a Tender, the central digital platform under the Procurement Act 2023, stays complete and current.

SkillClaude in ChromeProcurement portalCompanies House
SkillClaude in ChromeProcurement portalCompanies House
You give itYour company details, persons with significant control, connected people, accounts and the questions Find a Tender asks.
You get backA checked set of answers ready to enter or update, a note of anything that has changed since the last update, and a reminder to review it each time a director or shareholder changes.
You stillEnter it and confirm it is true. The details you share with every public buyer are a declaration by the firm.

Estimating and pricing

Enquiries out, quotes back and the price built from the drawings.

6 use cases

Sending enquiries to suppliers and subcontractors

Splits the tender into packages and writes the enquiry for each supplier and subcontractor, with the right drawings, specification clauses and return date.

SkillConnectorEmailFile storageSpreadsheet
SkillConnectorEmailFile storageSpreadsheet
You give itThe tender documents, your list of suppliers and subcontractors by trade, and the return date you need.
You get backAn enquiry email for each package with its scope written out, the documents to attach listed, a return date ahead of your own, and a log of who was asked and who has replied.
You stillChoose who you ask. Your best subcontractors are a reason you win, and who gets an enquiry is a relationship decision.
Highest value

Comparing quotes like for like

Reads every quote for a package and lines them up on the same scope, showing what each one excludes, assumes or prices differently.

Claude in ExcelSkillSpreadsheetEmail
Claude in ExcelSkillSpreadsheetEmail
You give itThe returned quotes, in whatever format they arrived, and the package scope.
You get backA comparison table with each quote adjusted to the same scope, the exclusions and qualifications listed side by side, and the gaps you would have to price yourself to use the cheapest.
You stillPick the subcontractor and the number you carry. The cheapest quote with the most exclusions is often the dearest, and you know who delivers.

Chasing the quotes that have not come back

Checks which suppliers and subcontractors have not returned a price before your deadline and sends each one a short chaser.

Scheduled taskConnectorEmailSpreadsheet
Scheduled taskConnectorEmailSpreadsheet
You give itThe enquiry log and read access to the estimating inbox.
You get backA daily note of the quotes still missing for each tender, chasers drafted for each one, and a warning when a package has fewer than 2 prices with 3 days to go.
You stillPhone the ones that matter. A subcontractor who will not price is telling you something about the job or about you.

Building up the preliminaries

Drafts the preliminaries build-up from the programme, the preliminaries document and your past jobs, so site set-up, staff, welfare and plant are all counted.

Claude in ExcelProjectSpreadsheetQuoting tool
Claude in ExcelProjectSpreadsheetQuoting tool
You give itThe preliminaries section, the tender programme and your preliminaries from 2 or 3 similar jobs.
You get backA draft build-up by week and by item, with each item tied to the clause that requires it, and the items the documents require that past jobs never priced.
You stillSet the durations and the staffing. Preliminaries are where a programme that is too short quietly takes the margin.

Checking the bill against the drawings

Compares the bill of quantities or schedule with the drawings and specification, and lists items that look missing, duplicated or measured differently.

ProjectCADQuoting tool
ProjectCADQuoting tool
You give itThe bill or schedule, the drawings as PDFs and the specification.
You get backA list of suspected omissions and mismatches with the drawing and bill references for each, so you can check them before pricing or raise them as queries.
You stillMeasure what matters and check the list. The check points you to places to look, and the quantities you price are still your measurement.

The papers for the tender review meeting

Pulls the estimate, the risks, the qualifications and the programme into the short paper the directors use to set the final price.

SkillQuoting toolSpreadsheet
SkillQuoting toolSpreadsheet
You give itThe estimate summary, the enquiry summary, the quote comparison and the qualifications.
You get backA 2 page paper with the cost, the risks priced and unpriced, the opportunities, how this compares with similar past tenders, and the decisions the meeting needs to take.
You stillSet the margin and the final number. That is the director's decision, and it belongs to the person who carries the result.

Method statements and safety

RAMS, the construction phase plan and the records CDM expects.

9 use cases
Highest time

The method statement and risk assessment for a package

Drafts the site specific RAMS for a package of work from your approved template, the drawings and the construction phase plan you are working under.

ProjectSkillFile storageCAD
ProjectSkillFile storageCAD
You give itYour RAMS template and a good past example, the drawings, the principal contractor's construction phase plan and site rules, and your notes on sequence and plant.
You get backA RAMS document with this site's access, sequence, plant, hazards, controls, PPE, emergency arrangements and permits filled in, and every place the template text does not fit this site flagged for you to check.
You stillDecide the safe way to do the work and sign it off. A method statement copied from another job is how people get hurt, so read it against the site.
Highest value

Reviewing subcontractors' RAMS

Reads a subcontractor's RAMS against the construction phase plan, the site rules and the drawings, and lists what is missing or wrong before it is accepted.

ProjectSkillEmailFile storage
ProjectSkillEmailFile storage
You give itThe subcontractor's RAMS, your construction phase plan and site rules, and the relevant drawings.
You get backA review note with each problem listed, such as the wrong site address, a missing rescue plan or plant the site cannot take, and a comment sheet ready to return to the subcontractor.
You stillAccept or reject it. Under CDM 2015 the principal contractor plans, manages and monitors the construction phase, and that judgement stays with you.

The construction phase plan

Drafts the construction phase plan from the pre-construction information, your standard arrangements and the project's own risks.

ProjectSkillFile storageProject management
ProjectSkillFile storageProject management
You give itThe client's pre-construction information, your standard plan, the programme and site layout, and the list of contractors.
You get backA draft plan setting out the health and safety arrangements and site rules for this project, with the project's significant risks drawn from the pre-construction information and the sections needing a site visit marked.
You stillWalk the site and own the plan. CDM 2015 requires the principal contractor to draw it up before setting up the site and to keep it reviewed as the job changes.

The site induction

Writes the site specific induction from the construction phase plan, so every worker hears this site's rules, hazards, emergency arrangements and welfare.

SkillSlidesForms
SkillSlidesForms
You give itThe construction phase plan or RAMS, the site layout and your standard induction.
You get backAn induction script and slides for this site, a short question sheet to check understanding, and a sign-in record ready to print.
You stillGive the induction and answer the questions. CDM 2015 requires every worker to have a suitable site induction, and that is a conversation, not a document.

This week's toolbox talk

Writes a short toolbox talk on a topic that matters on this site this week, from the programme, recent near misses or the work starting next.

Scheduled taskSkillProject managementForms
Scheduled taskSkillProject managementForms
You give itThe 2 week look-ahead, the near miss and observation log, and the topics already covered on this job.
You get backA 10 minute talk in plain words with 3 questions to ask the gang and an attendance sheet, on a topic picked for the work coming up rather than from a rota.
You stillDeliver it and listen. The value of a toolbox talk is in what the gang tells you back.

The accident report and investigation

Turns the accident book entry, statements and photos into a structured investigation report and checks whether and when the accident must be reported under RIDDOR.

SkillFormsPhotosFile storage
SkillFormsPhotosFile storage
You give itThe accident book entry, witness statements, photos, the RAMS for the task and the injured person's absence so far.
You get backAn investigation report with the sequence of events, immediate and underlying causes and actions, and a note on reporting: an over 7 day injury must be reported to HSE within 15 days of the accident.
You stillTalk to the people involved, decide what changes and make the report to HSE. The investigation is the director's responsibility.

COSHH assessments from the data sheets

Reads the safety data sheets for the products a package uses, such as adhesives, resins and cutting silica, and drafts the COSHH assessment for how your gangs actually use them.

ProjectSkillSDS softwareFile storage
ProjectSkillSDS softwareFile storage
You give itThe safety data sheets, the RAMS for the task and how the product is used on site, including where and for how long.
You get backA COSHH assessment per product with the hazards, the exposure on this task, the controls and PPE, and a short briefing sheet for the gang, with any data sheet older than the product's current version flagged.
You stillDecide the controls and make sure they are used. Dust and fumes cause long term harm that nobody sees on the day, so supervision matters more than the form.

Inspection and permit registers

Reads the week's inspection forms and permits from site and keeps the registers, flagging anything overdue or not closed out.

Scheduled taskConnectorFormsSite appSpreadsheet
Scheduled taskConnectorFormsSite appSpreadsheet
You give itThe inspection forms for scaffolds, excavations, lifting gear and similar, and the permits issued this week.
You get backUp to date registers with the next inspection due for each item, and a list each Friday of what is overdue, what failed and what is still open.
You stillDo the inspections and act on what they find. A register records that the check happened, and the check is what keeps people safe.
Highest value

The monthly health and safety report

Pulls accidents, near misses, inspections, audit findings and training gaps from every site into one report for the directors.

ProjectScheduled taskSpreadsheetForms
ProjectScheduled taskSpreadsheetForms
You give itThe month's accident and near miss records, site audit reports and the training matrix.
You get backA report with the numbers by site, the trends over 12 months, the open actions and their owners, and the 3 issues the directors should discuss, with each figure traced to its record.
You stillLead on safety. HSE recorded 25 fatal injuries to construction workers in Great Britain in 2025 to 2026, provisionally, and what the directors do with the report is what counts.

Starting a project

The contract review, the handover from estimating and the orders.

5 use cases
Highest value

Reviewing the contract before you sign

Compares the contract or subcontract you have been sent with the standard form and with your tender, and lists every amendment and what it changes for you.

ProjectSkillContract administrationFile storage
ProjectSkillContract administrationFile storage
You give itThe contract or subcontract with its amendments, the standard form it is based on, and your tender and qualifications.
You get backA schedule of amendments covering payment, retention, damages, design, notices, set-off and termination, with each one compared with the standard form, and a note where the contract ignores your qualifications.
You stillNegotiate and sign, with your solicitor on anything serious. The schedule shows you what changed, and what you will accept is a commercial decision.

The handover from estimating to the site team

Writes the handover pack the contracts manager needs when a job is won: what was priced, what was assumed, what was excluded and what the client was promised.

ProjectSkillQuoting toolFile storage
ProjectSkillQuoting toolFile storage
You give itThe estimate, the tender submission, the qualifications, the tender queries and answers, and the contract.
You get backA handover document with the budget by package, the allowances, the assumptions and exclusions, the programme promised and the commitments made in the quality submission.
You stillHold the handover meeting. The contracts manager needs to hear from the estimator what worried them, and that is said, not written.

The procurement schedule

Works back from the programme to the dates each package must be ordered, approved and delivered, including design approvals and long lead items.

Claude in ExcelSkillProject managementSpreadsheet
Claude in ExcelSkillProject managementSpreadsheet
You give itThe programme, the package list and the lead times you know for each material and trade.
You get backA schedule with order, approval and delivery dates for each package, the long lead items at the top, and the packages already late against the programme.
You stillAgree it with the buyer and the site team and chase the approvals. The schedule shows the dates, and getting the client to approve on time is a relationship.

The start-up checklist for a new project

Builds the start-up checklist for a new job from the contract and the pre-construction information, including whether the project is notifiable to HSE and whether it is a higher-risk building.

SkillFile storageProject management
SkillFile storageProject management
You give itThe contract, the pre-construction information, the programme and the expected numbers on site.
You get backA checklist of what must be in place before work starts, with a note that a project is notifiable if it lasts longer than 30 working days with more than 20 workers at once, or exceeds 500 person days.
You stillConfirm with the client that they have notified HSE where it is needed. Under CDM 2015 the notice is the client's duty, and starting without the basics in place is yours.

The contract programme and its narrative

Writes the narrative that explains the programme you submit for acceptance: the logic, the critical path, the key dates and the assumptions behind them.

SkillProject managementFile storage
SkillProject managementFile storage
You give itThe programme export, the contract dates and your notes on sequence and resources.
You get backA narrative that describes the sequence, the critical path, the float, the assumptions about access and information, and the client's dates the programme depends on.
You stillBuild the programme. The narrative explains it, and a programme you cannot defend later will not support a claim for more time.

Running the site

Diaries, RFIs, drawings and the report the client reads each month.

6 use cases
Highest time

Turning the site diary into a weekly report

Reads the week's diary entries, labour returns and photos and writes the weekly site report, keeping the record of what happened each day.

ConnectorSkillSite appPhotosProject management
ConnectorSkillSite appPhotosProject management
You give itThe site diary, the labour and plant returns, the photos and the programme.
You get backA weekly report with progress against programme, labour by trade, weather, deliveries, visitors, instructions received and delays, each item dated and linked to its photo.
You stillKeep a diary worth reading. When a variation or a delay is argued months later, the diary written on the day is the evidence.

RFIs and technical queries

Drafts each request for information from the site team's notes and photos, and keeps the register of what is open, overdue and answered.

SkillScheduled taskEmailProject managementPhotos
SkillScheduled taskEmailProject managementPhotos
You give itThe site team's question, the drawing and specification references, photos, and the RFI register.
You get backA clear RFI with the references, the question and the date you need an answer by to hold the programme, and a weekly list of RFIs overdue with the work each one is holding up.
You stillDecide what to ask and when to push. An unanswered RFI that delays the work is the start of a notice, and the contracts manager judges when that point arrives.

Keeping the drawing register straight

Reads each drawing issue, updates the register and lists what changed from the last revision so site works to the current one.

ConnectorSkillEmailFile storageCAD
ConnectorSkillEmailFile storageCAD
You give itThe drawing issue sheets and the drawings as they arrive, and your current register.
You get backAn updated register, a note for site of which drawings are superseded, and a list of revisions that change your scope, which may be variations.
You stillMake sure the old drawings come off site. A superseded drawing on a site office wall costs more than any register.

The monthly progress report to the client

Writes the monthly report the client or main contractor asks for, from the weekly reports, the programme, the RFI register and the health and safety figures.

ProjectSkillProject managementPhotosSlides
ProjectSkillProject managementPhotosSlides
You give itThe month's weekly reports, the updated programme, the RFI and change registers and the safety figures.
You get backA report in the client's format covering progress, programme, information required, change, health and safety and the look-ahead, with photos, written in the same order every month.
You stillPresent it and handle the difficult conversation it may start. The report states the facts, and the relationship with the client is yours.

Minutes of the progress and coordination meetings

Turns the recording or notes of the progress meeting into minutes with an action log, and sends each owner their actions.

SkillConnectorCall recordingEmail
SkillConnectorCall recordingEmail
You give itThe meeting notes or recording, the agenda and the last action log.
You get backMinutes with the decisions, the actions with owners and dates, and the actions carried over from last time marked, plus a short email to each subcontractor with their own actions.
You stillCheck the minutes say what was agreed, especially anything about time or money. Minutes are often the first record of an instruction.

The 2 week look-ahead

Drafts the 2 week look-ahead from the programme, this week's progress and the open RFIs, deliveries and permits.

SkillProject managementSpreadsheet
SkillProject managementSpreadsheet
You give itThe programme, the weekly report, the RFI register, the delivery schedule and the subcontractors' planned labour.
You get backA look-ahead by trade and area for the next 2 weeks, with the things that could stop each activity listed beside it, such as an unanswered RFI or a delivery not yet booked.
You stillAgree it with the trades on Monday morning. A look-ahead works because the foremen commit to it.

Variations and change

Instructions, notices and the letters that get extra work paid.

9 use cases
Highest time

The variation letter from a site instruction

Turns an instruction, whether written, verbal or a revised drawing, into a variation letter that records what changed, when and on whose authority.

ProjectSkillContract administrationEmailPhotos
ProjectSkillContract administrationEmailPhotos
You give itThe instruction or the note of a verbal one, the revised drawing, the diary entry and photos, and the contract's change clause.
You get backA letter in your standard form that records the instruction, describes the change against the original scope, reserves your position on time and cost and asks for written confirmation where the instruction was verbal.
You stillSend it the same week. A variation is easiest to agree while everyone still remembers the conversation on site.

Pricing and writing up a variation

Builds the variation quotation from your contract rates, the measured change and any new rates, with the build-up laid out the way the contract asks.

Claude in ExcelSkillSpreadsheetContract administration
Claude in ExcelSkillSpreadsheetContract administration
You give itThe variation letter, the measured quantities, the contract rates or schedule, and supplier quotes for new items.
You get backA priced quotation with each item tied to a contract rate or a new rate built from cost, the time effect stated, and the items you could not price without more information listed.
You stillSet the price and negotiate it. The build-up makes your number easy to check, and agreeing it is a conversation with the QS on the other side.

The change register

Keeps one register of every instruction, variation, early warning and claim on a job, with its status, value and the date of each step.

Scheduled taskConnectorContract administrationEmailSpreadsheet
Scheduled taskConnectorContract administrationEmailSpreadsheet
You give itRead access to the project email and the variation letters, quotations and responses.
You get backA register updated each week showing each change as notified, priced, submitted, agreed or disputed, its value, and the ones waiting longest for an answer.
You stillChase the ones that matter. The register tells you which changes have gone quiet, and unagreed variations are where final accounts are lost.
Highest value

Early warnings and notices of delay

Drafts the notice the contract requires when something could cost time or money, such as an NEC early warning or a JCT notice of delay, from the facts on site.

ProjectSkillContract administrationEmail
ProjectSkillContract administrationEmail
You give itWhat has happened, the diary entries and photos, the programme, and the notice clauses of your contract.
You get backA notice that names the event, its likely effect on time and cost, and the clause it is given under, addressed to the person the contract names, with a reminder of any time limit in your contract.
You stillDecide to send it, and send it in time. Your contract sets out when each notice must be given, and a late one can weaken your case for more time or money.

The compensation event quotation

Drafts the quotation for an NEC compensation event, with the changes to defined cost and the effect on the programme set out the way the contract asks.

ProjectClaude in ExcelContract administrationSpreadsheetProject management
ProjectClaude in ExcelContract administrationSpreadsheetProject management
You give itThe compensation event notification, the records of resources and cost, the accepted programme and the schedule of cost components.
You get backA draft quotation with the defined cost build-up, the fee, the risk allowances and the programme effect explained, and a list of the records that would support each figure.
You stillAgree the assumptions and submit it. A quotation is a forecast you will be held to, so the risk allowance is your judgement.

Daywork sheets into a priced record

Reads the signed daywork sheets, prices them at the contract's daywork rates and matches each one to an instruction.

Claude in ExcelTimesheet softwareSpreadsheet
Claude in ExcelTimesheet softwareSpreadsheet
You give itThe daywork sheets, the contract's daywork rates and the instructions they relate to.
You get backA priced daywork summary for each instruction, the sheets that are unsigned or have no instruction behind them, and the totals ready for the next application.
You stillGet the sheets signed on the day. An unsigned daywork sheet is a conversation you will probably lose.

The extension of time claim

Builds the narrative and the evidence for a claim for more time, linking each delaying event to the programme and to the records made at the time.

ProjectCoworkProject managementFile storageEmail
ProjectCoworkProject managementFile storageEmail
You give itThe notices sent, the programmes as planned and as built, the site diaries, the RFI register, the minutes and the correspondence.
You get backA claim narrative with a dated chronology for each event, the evidence for each fact referenced, the effect on the critical path described, and the gaps in the records listed.
You stillDecide what to claim and how hard to push. A delay analysis on a large claim may need an expert, and the commercial strategy is yours.

Finding the changes nobody wrote up

Reads a job's emails, minutes, diaries and drawing revisions to find instructions and scope changes that never became a variation.

ProjectConnectorEmailFile storageContract administration
ProjectConnectorEmailFile storageContract administration
You give itRead access to the project's email, the minutes, the diaries, the drawing register and the change register.
You get backA list of possible unrecorded changes with the date, the source and the words used, set against the change register so you can see which were never notified.
You stillJudge which are real and worth pursuing. Some will be your own scope, and claiming for those costs goodwill.

The chronology for a dispute

Builds a dated chronology of a disputed matter from the correspondence, notices and records, for your adviser and for an adjudication if it comes to one.

ProjectCoworkEmailFile storage
ProjectCoworkEmailFile storage
You give itThe contract, the notices, the correspondence, the minutes and the site records on the issue in dispute.
You get backA chronology with every relevant event, the document that proves it and a link to it, and the points where your records are thin. Under the Construction Act an adjudicator decides within 28 days of referral unless the time is extended.
You stillTake advice and decide whether to refer the dispute. Adjudication is fast and binding until finally settled, and the strategy belongs to you and your adviser.

Getting paid

Applications, payment notices, retention and the final account.

7 use cases
Highest time

The monthly application for payment

Builds the application for payment from the measured progress, the variations and the materials on site, set out the way the contract asks and submitted on its date.

Claude in ExcelProjectSpreadsheetContract administrationAccounting
Claude in ExcelProjectSpreadsheetContract administrationAccounting
You give itThe contract sum analysis, last month's application, this month's progress, the change register and the dayworks.
You get backAn application with each line valued against progress, the variations split agreed and unagreed, retention calculated and the backup listed, ready to send before the contract's application date.
You stillValue the work fairly and submit on time. An application that is too high damages trust, and one that is late can lose you a month of cash.
Highest value

Checking the payment notice against the application

Compares the payment notice you receive with what you applied for, line by line, and drafts the response to anything cut without a reason.

Claude in ExcelSkillEmailSpreadsheetContract administration
Claude in ExcelSkillEmailSpreadsheetContract administration
You give itYour application, the payment notice or pay less notice, and the contract's payment terms.
You get backA reconciliation showing every line reduced, the reasons given and the ones with none, a note of whether the notice arrived in time, and a draft letter challenging the reductions.
You stillDecide what to fight for. The Construction Act requires a payment notice within 5 days of the due date stating the sum and how it was worked out, and how hard to push is a commercial call.

Chasing retention you are owed

Keeps a ledger of the retention held on every job and when each part is due back, and drafts the request when a release date passes.

Scheduled taskClaude in ExcelAccountingSpreadsheetEmail
Scheduled taskClaude in ExcelAccountingSpreadsheetEmail
You give itYour contracts' retention terms, completion dates, defects periods and the retention held on each application.
You get backA retention ledger by job and client, a monthly list of releases due and overdue, and release requests drafted with the dates and the contract clause.
You stillMake the phone call when a letter is ignored. Retention is easier to recover while the job is still fresh in the client's mind.

Building the final account

Pulls the contract sum, every variation, dayworks, adjustments and claims into the final account with the evidence for each item.

ProjectClaude in ExcelSpreadsheetContract administrationFile storage
ProjectClaude in ExcelSpreadsheetContract administrationFile storage
You give itThe contract sum analysis, the change register, the variation letters and quotations, the agreed items and the last application.
You get backA final account with agreed, submitted and disputed items separated, each one referenced to its instruction and backup, and the items with no instruction or evidence listed.
You stillNegotiate it. The final account is settled across a table, and what you trade to close it is the judgement of the person who knows the job.

Which overdue payments to chase first

Reads the aged debt report against each client's payment terms and history and lists who to chase, in order of what is at stake.

Scheduled taskSkillAccountingEmail
Scheduled taskSkillAccountingEmail
You give itThe aged debt report from the accounts, the payment terms on each contract and your notes on each client.
You get backA weekly list ranked by amount and days overdue, with the contract's final date for payment and the last contact, and a firm but polite chaser drafted for each.
You stillMake the calls to the clients who matter. On public work the Procurement Act 2023 implies 30 day payment terms into public sub-contracts, and using that is your call.

The letter when a client will not pay

Drafts the escalating letters when a sum is unpaid after the final date for payment, from a reminder through to notice of intention to suspend.

SkillEmailContract administration
SkillEmailContract administration
You give itThe application, any payment notice, the contract's payment terms and the correspondence since.
You get backA set of drafts in the right order, each stating the sum, the dates and the contract or statutory basis, with the step that must be taken before suspension marked for your adviser to check.
You stillDecide whether to suspend or adjudicate, with advice. Suspension stops the job and tests the relationship, so it is a director's decision.

Checking invoices for reverse charge VAT

Checks each sales and purchase invoice for construction services against the domestic reverse charge rules before it goes out or is posted.

SkillConnectorAccounting
SkillConnectorAccounting
You give itThe month's sales and purchase invoices and your customers' and suppliers' status as end users or not.
You get backA list of invoices where the VAT treatment looks wrong, with the reason. GOV.UK says the reverse charge covers the same services as CIS construction operations, except supplies of workers by employment businesses.
You stillAgree the treatment with your accountant where it is unclear. The check finds the odd ones, and the VAT return is still signed by the business.

Subcontractors and suppliers

Orders, documents before site, and paying them under CIS.

6 use cases

Subcontract orders that match the main contract

Drafts each subcontract order from your standard terms, the agreed quote and the main contract, so what you pass down matches what you carry.

ProjectSkillContract administrationFile storage
ProjectSkillContract administrationFile storage
You give itYour subcontract template, the agreed quote and scope, the main contract's key terms and the programme dates for the package.
You get backAn order with the scope, price, programme, payment terms, retention and the main contract obligations passed down, and a list of places where the subcontractor's quote and your order disagree.
You stillAgree the terms with the subcontractor and sign. The order fixes what you can recover from them later, so check it against what you agreed.
Highest time

Subcontractor documents before they start

Checks what each subcontractor has sent before they start, such as insurances, RAMS, training and cards, and chases what is missing or expired.

Scheduled taskConnectorEmailCompliance trackerSpreadsheet
Scheduled taskConnectorEmailCompliance trackerSpreadsheet
You give itYour list of required documents, read access to the inbox where they arrive and your subcontractor register.
You get backA register showing each subcontractor's documents with expiry dates, a list each week of who is not cleared to start, and chasers drafted for the missing ones.
You stillRefuse to let them start until they are cleared. CDM 2015 requires reasonable steps to check the competence of anyone you appoint.

CIS deductions and statements for subcontractors

Works out each subcontractor's CIS deduction from their invoice and HMRC verification status, and drafts the payment and deduction statements.

Claude in ExcelSkillAccountingHMRC portalSpreadsheet
Claude in ExcelSkillAccountingHMRC portalSpreadsheet
You give itThe month's subcontractor invoices, each one's verification status and the payments made.
You get backA schedule of deductions at 20% registered, 30% unregistered and 0% gross, with materials and VAT taken out first, and statements due within 14 days of the end of the tax month.
You stillVerify new subcontractors with HMRC and check anyone working like an employee. A wrong employment status on the return can cost up to £3,000.

Valuing subcontractors' applications

Checks each subcontractor's application against progress on site, their order, agreed variations and your own application, and drafts the payment notice.

Claude in ExcelSkillSpreadsheetContract administration
Claude in ExcelSkillSpreadsheetContract administration
You give itThe subcontractor's application, their order, the site's progress record and the variations agreed with them.
You get backA valuation with each line checked and adjusted with a reason, and a payment notice that states the sum and how it was calculated, ready to issue on the subcontract's date.
You stillValue it fairly and pay on time. A subcontractor who is paid fairly and promptly is one who turns up for the next job.

Rating subcontractors after each job

Brings together each subcontractor's record on a job, from programme and quality to safety and paperwork, into a short rating for your approved list.

SkillSpreadsheetProject management
SkillSpreadsheetProject management
You give itThe site reports, the defect and accident records, the change register and the site manager's comments.
You get backA rating per subcontractor with the evidence, a note of who to use again and who to drop, and your approved list updated.
You stillTalk to the site manager before you drop anyone. The record shows what happened, and the site team knows why.

Chasing deliveries against the programme

Checks open orders against the procurement schedule and the look-ahead, and chases suppliers whose deliveries put the programme at risk.

Scheduled taskConnectorEmailSpreadsheet
Scheduled taskConnectorEmailSpreadsheet
You give itThe open orders, the procurement schedule, the look-ahead and the delivery confirmations in the inbox.
You get backA list each morning of deliveries due in the next 2 weeks that are unconfirmed or late, with chasers drafted and the work each one holds up.
You stillFind the alternative when a supplier lets you down. The list warns you early, and finding stock is still a phone call.

Quality and handover

Snags, O&M manuals and the information the client keeps.

5 use cases

Snag lists into actions for each trade

Turns walk-round notes and photos into a snag list sorted by trade and area, and tracks each snag to close-out.

SkillConnectorPhotosSite appEmail
SkillConnectorPhotosSite appEmail
You give itYour notes, voice memos and photos from the walk-round, and the list of trades.
You get backA snag list per trade with location, description and photo, sent to each subcontractor, and a daily status of what is open, closed and disputed.
You stillWalk the building and sign off the work. The list keeps track of the snags, and the standard of finish is your judgement.
Highest time

Assembling the O&M manual

Collects the data sheets, certificates, warranties and as-built drawings for the O&M manual, chases what is missing and assembles it in the client's structure.

ProjectCoworkFile storageEmail
ProjectCoworkFile storageEmail
You give itThe client's required structure, your subcontractors' contacts and read access to the documents they send in.
You get backA manual assembled to the client's index with every section filled or marked missing, a chase list by subcontractor, and a cover summary of the maintenance tasks and their frequencies.
You stillCheck it before it goes. The client relies on the manual to run and maintain the building, and a missing certificate is found when something goes wrong.

Information for the health and safety file

Pulls the information from your records that the principal designer needs for the health and safety file, such as residual risks, as-built details and hazardous materials.

ProjectFile storageCAD
ProjectFile storageCAD
You give itThe construction phase plan, the RAMS, the as-built drawings, the material data sheets and the principal designer's file index.
You get backA file contribution set out under the principal designer's headings, with each item referenced to its source document and the gaps listed.
You stillSend it and answer the principal designer's questions. CDM 2015 requires the principal contractor to provide what it holds that is relevant to the file.

Compliance information on a higher-risk building

Keeps the record of how your work meets the Building Regulations on a higher-risk building, and drafts the concerns you must report to the principal contractor.

ProjectSkillFile storageCADPhotos
ProjectSkillFile storageCADPhotos
You give itYour scope, the approved drawings and specification, inspection records, product data and any change to the approved design.
You get backA compliance record for your package, a list of changes that may need approval before they are built, and a draft note to the principal contractor raising any concern about related work.
You stillRaise concerns when you see them. On higher-risk buildings the Building Safety Regulator must approve the work before it starts, and a change built without approval is a serious matter.

Defects after completion

Logs each defect the client reports in the defects period, sends it to the right trade and tracks it to close-out and the release of retention.

Scheduled taskConnectorEmailSpreadsheet
Scheduled taskConnectorEmailSpreadsheet
You give itThe client's defect reports, the subcontract orders and the defects period dates.
You get backA defects register with the trade, date reported, response and close-out for each, chasers to the trades, and the evidence you need when you ask for the retention back.
You stillDecide what is a defect and what is wear or misuse. That conversation with the client needs someone who knows the building.

Labour, cards and training

Who is qualified for what, and what expires next month.

4 use cases

The training and card matrix

Keeps one record of every operative's cards, tickets and training with expiry dates, and lists what runs out in the next 60 days.

Scheduled taskClaude in ExcelCompliance trackerSpreadsheet
Scheduled taskClaude in ExcelCompliance trackerSpreadsheet
You give itCopies of cards and certificates as they come in, and your current training records.
You get backA matrix by person and qualification, a monthly list of expiries with the courses to book, and a check of who is qualified for the work on each site next month.
You stillBook the training and pay for it. CDM 2015 says a contractor must not appoint anyone without the necessary skills, knowledge, training and experience, or in the process of getting them.

Timesheets into payroll and job costs

Reads the week's timesheets, checks them against the site diary and allocates the hours to jobs and cost codes before payroll.

Claude in ExcelConnectorTimesheet softwarePayroll softwareSpreadsheet
Claude in ExcelConnectorTimesheet softwarePayroll softwareSpreadsheet
You give itThe timesheets, the site diaries and the job and cost code list.
You get backHours by person, job and code, the timesheets that disagree with the diary or have no code, and the labour cost for each job against its budget.
You stillApprove the hours. Questions about someone's pay are best answered by the person who runs the gang.

The labour plan across every job

Adds up the labour each job needs over the next 8 weeks from the programmes, against the people you employ and the subcontract gangs you can call on.

Claude in ExcelSkillProject managementSpreadsheet
Claude in ExcelSkillProject managementSpreadsheet
You give itEach job's programme or look-ahead, your staff list with skills, and your subcontract gangs.
You get backA week by week chart of labour needed and available by trade, the weeks you are short or over, and the jobs that clash for the same people.
You stillDecide who goes where. Moving a good foreman between jobs is a decision about people and clients as well as hours.

Adverts and offers for site and office roles

Writes the job advert and the offer letter for a site or office role from the work it covers, the cards and tickets it needs and the pay you set.

SkillFile storageEmail
SkillFile storageEmail
You give itWhat the role does, the qualifications required, the pay and conditions, and your standard offer letter.
You get backAn advert in plain words with the cards and experience required, and an offer letter with the terms filled in, ready for your review.
You stillInterview and choose. Whether someone will fit your gangs and your clients is a judgement no advert makes.

Running the business

CIS, the monthly cost report, cash and the directors' meeting.

6 use cases

The monthly CIS return

Prepares the monthly CIS return from the month's subcontractor payments and deductions, and checks it before the deadline.

Scheduled taskClaude in ExcelAccountingHMRC portal
Scheduled taskClaude in ExcelAccountingHMRC portal
You give itThe schedule of payments and deductions for the tax month and the verification records.
You get backA return ready to file with every subcontractor checked against verification, the totals reconciled to the accounts, and a reminder that it must reach HMRC by the 19th.
You stillFile it and make the declaration. A return 1 day late costs £100, and you are declaring that the subcontractors listed are not employees.
Highest value

The monthly cost value reconciliation

Brings together each job's valuation, costs to date, committed costs and forecast to completion into the monthly cost value reconciliation.

Claude in ExcelProjectAccountingSpreadsheet
Claude in ExcelProjectAccountingSpreadsheet
You give itThe applications and valuations, the cost ledger by job, the open orders and the QS's notes on each job.
You get backA reconciliation by job with value, cost, margin and forecast, the jobs where margin has moved since last month and why, and the figures that need a QS to explain them.
You stillChallenge the forecasts. A CVR is only as honest as the people who report into it, and spotting a job going wrong early is your job.

The cash forecast by job

Rolls the cash forecast forward each week from applications due, payment terms, retention, subcontractor payments, payroll and the CIS and VAT dates.

Claude in ExcelScheduled taskAccountingSpreadsheet
Claude in ExcelScheduled taskAccountingSpreadsheet
You give itLast week's forecast, the bank balance, the application and payment schedules and the aged debt and creditor reports.
You get backA 13 week forecast by job and in total, the weeks that look tight, and the payments in and out that move it most.
You stillDecide what to do about a tight week. Contracting runs on cash, and only you can decide what to hold back or chase.

The monthly directors' report

Writes the monthly report for the directors from the CVR, the cash forecast, the order book, the tender list and the safety report.

ProjectSkillSpreadsheetAccountingSlides
ProjectSkillSpreadsheetAccountingSlides
You give itThis month's CVR, cash forecast, tender list and wins, safety report and any notes from the contracts managers.
You get backA report covering safety, order book, tenders, margin by job, cash and the decisions needed, with the same figures in the same place every month.
You stillLead the meeting and make the decisions. The report puts the facts on the table, and deciding what to do about them is the board's work.

The insurance renewal

Fills in the renewal proposal for your contractors' all risks, liability and professional indemnity cover from your turnover, claims, contracts and activities.

ProjectFile storage
ProjectFile storage
You give itLast year's proposal, this year's turnover and contract details, claims history and any new activities such as design.
You get backA completed proposal with changes since last year marked, and a check of whether your cover meets the levels your current contracts require.
You stillDecide the cover with your broker. What you are insured for decides which contracts you can sign.

The order book and the year ahead

Pulls secured work, likely wins and the tender list into a view of turnover and workload for the next 12 months, by month.

Claude in ExcelSkillSpreadsheetProject management
Claude in ExcelSkillSpreadsheetProject management
You give itThe secured contracts and their programmes, the tender list with your chance of winning each, and last year's turnover by month.
You get backA month by month chart of secured and likely work against your target turnover, the gaps to fill, and the months where you would be overstretched if too much is won.
You stillDecide which work to chase to fill the gaps. The order book shows where they are, and the strategy for winning is yours.
[ TAKE IT WITH YOU ]

All 78 on one page, to go through with your team.

A printable checklist of every use case above, with what each one does. Tick the ones that fit, then bring your shortlist to a free 30-minute call with us.

Quick human check: your name and your job. It proves you are not a bot, and it means the advice we send fits the work you do.

We look after your email as the privacy notice says.

[THE NUMBERS]

What it is worth on your numbers

Nobody has published how many hours a week estimators, quantity surveyors and contracts managers spend on this work, so put in your own.

£52500
6
8 hrs
50%
£250000

Costed at £32 an hour. An hour is costed from that salary plus employer National Insurance and pension, over 1,740 hours.

0
hours a week, back, per person
Hours a year across the team0
Working days a year back, each0
Cost of that time
£0
What those days could earn
£0
Total opportunity
£0

This values the hours at what they cost the business. A day back for an estimator is another tender priced, and a day back for a QS is a variation agreed before the final account, but nobody has published a way to measure either, so we have not put a figure on it.

[TWELVE MONTHS]

What good looks like in 12 months

Not a bigger job. The same job, with the work on the right hand side of that list mostly gone and the time spent on pricing, building and the clients who give you work.

Quality answers are copied from the last bid the night before it goes
Every answer starts from your best scored version, and the estimator's time goes on how you would build this job
Method statements carry the last site's name and access route
Each RAMS is drafted for this site, and the contracts manager spends the time checking the sequence
Instructions given on site are written up weeks later, if at all
A variation letter goes the same week, and the change register shows what is still unagreed
The payment notice is accepted because nobody had time to check it
Every reduction is checked line by line and answered before the next application
Subcontractors arrive on site before their documents do
Nobody starts until they are cleared, and the chasing happens without anyone remembering to do it
The final account drags on for a year after handover
It is built as the job goes, with the evidence for every item already in one place

Want us to help you build one?

Pick one use case from this page. We will spend 30 minutes on a call with you, with no slides, and you keep whatever we build.

Book a call

Questions construction contractors ask about AI

How can construction companies use AI?

Start with the paperwork around the build. Claude can draft the quality answers for a tender from your best past bids, write site specific RAMS from your approved template, turn a site instruction into a variation letter and build the monthly application for payment. Your estimators and contracts managers check each one, price the work and sign it off.

Can AI write a method statement and risk assessment?

It can draft one, but a person decides the safe way to do the work. Claude drafts the RAMS for a package from your template, the drawings and the construction phase plan. Under CDM 2015 the principal contractor plans, manages and monitors the construction phase, so the contracts manager reads the draft against the site and signs it.

How much time can AI save on a tender?

Our estimates are large for the biggest bid documents. A quality submission drops from 16 hours by hand to 3 with Claude, reading an enquiry pack from 2 hours 30 to 25 minutes, and a supplier questionnaire from 3 hours to 30 minutes. Nobody has published measured times, so the calculator on this page uses your own.

Can AI help contractors get paid on time?

Yes, by keeping the paperwork current. Claude drafts the monthly application for payment from measured progress, variations and materials, and checks the payment notice you get line by line. The Construction Act requires a payment notice within 5 days of the due date, stating the sum and how it was worked out. How hard to push is yours.

[ FREE CHECKLIST ]

All 78 on one page.

A printable checklist of every use case on this page, with what each one does. Leave your email and it opens straight away.

Quick human check: your name and your job. It proves you are not a bot, and it means the advice we send fits the work you do.

We look after your email as the privacy notice says.