Keeping the tender list up to date
Reads every enquiry and invitation that arrives by email or portal and keeps one list of what is out, what it is, who it is for and when it is due back.
A UK construction contractor can use AI to draft the tenders, method statements and variation letters that keep its people from building. This page lists 78 use cases, led by tenders (10) and method statements and safety (9). Get AI Powers Ltd, a UK firm that sets Claude up inside businesses and trains their people, wrote it.
This page lists the jobs inside a UK construction contractor or specialist subcontractor that AI can take on, broken down by the part of the business that does them. It is written for owners and directors of firms of 10 to 250 people, and it starts with the documents that take your estimators, quantity surveyors and contracts managers away from pricing and building: the tender response, the method statement and the variation letter.
These are the tasks that come round on every tender, every job and every month in a contractor or specialist subcontractor of 10 to 250 people, grouped by the kind of work they are.
This is the point of the whole page. The work in the left column is why clients give you the job. The work in the right column has grown up around it, and in most firms it is done in the evenings by the people you most need on site and on the price.
The use case for AI is taking away the time that gets spent on the work sitting around the job, and freeing your people up to do the work only a human can do. The work that grows the business, and the work they enjoy the most.
The times are our own estimates for a contractor or specialist subcontractor of 10 to 250 people. Nobody has published measured times for this work, so treat them as a starting point and put your own into the calculator. The highlighted use cases either take the most hours or make the biggest difference to margin and cash.
Enquiries, quality submissions and the bid that goes in on Friday.
Reads every enquiry and invitation that arrives by email or portal and keeps one list of what is out, what it is, who it is for and when it is due back.
Reads the whole tender pack, from the preliminaries to the contract amendments, and pulls out the points that decide whether and how you price it.
Scores an enquiry against the criteria you set, such as client, value, location, workload and contract terms, so the decision is written down the same way every time.
Writes first drafts of the quality answers for this tender, built from your best answers to past bids and fitted to this client's questions, scoring guide and word limits.
Writes the method statement and programme narrative that go in with the tender, describing the sequence, the logistics and how you will handle the site's constraints.
Finds the gaps and conflicts in the tender documents, such as a drawing that disagrees with the specification, and drafts the queries before the deadline for questions.
Drafts the list of qualifications and clarifications that goes with your price, from the estimate's assumptions and the gaps found in the pack.
Picks the past projects and people that match this tender and rewrites the case studies and CVs to the client's format and length.
Drafts the social value response for a public sector tender from what your firm actually does locally, in the buyer's own measures.
Reads the feedback and scores from tenders you lost and won, and shows where your answers keep dropping marks. Under the Procurement Act 2023 public buyers give bid assessments for final tenders.
Scheme renewals and the same questions from every new client.
Fills in a new client's or main contractor's supplier questionnaire from your policies, accounts, insurances and past answers.
Prepares the evidence for each scheme renewal, such as your health and safety and Common Assessment Standard assessments, from what changed since last year.
Checks your health and safety, environmental, quality, equality and modern slavery policies for out of date names, dates and references, and drafts the updates.
Drafts a framework application, which asks the same things as a tender at greater length, from your library of answers and evidence.
Gathers and checks the core business details public buyers ask for, so the record you keep on Find a Tender, the central digital platform under the Procurement Act 2023, stays complete and current.
Enquiries out, quotes back and the price built from the drawings.
Splits the tender into packages and writes the enquiry for each supplier and subcontractor, with the right drawings, specification clauses and return date.
Reads every quote for a package and lines them up on the same scope, showing what each one excludes, assumes or prices differently.
Checks which suppliers and subcontractors have not returned a price before your deadline and sends each one a short chaser.
Drafts the preliminaries build-up from the programme, the preliminaries document and your past jobs, so site set-up, staff, welfare and plant are all counted.
Compares the bill of quantities or schedule with the drawings and specification, and lists items that look missing, duplicated or measured differently.
Pulls the estimate, the risks, the qualifications and the programme into the short paper the directors use to set the final price.
RAMS, the construction phase plan and the records CDM expects.
Drafts the site specific RAMS for a package of work from your approved template, the drawings and the construction phase plan you are working under.
Reads a subcontractor's RAMS against the construction phase plan, the site rules and the drawings, and lists what is missing or wrong before it is accepted.
Drafts the construction phase plan from the pre-construction information, your standard arrangements and the project's own risks.
Writes the site specific induction from the construction phase plan, so every worker hears this site's rules, hazards, emergency arrangements and welfare.
Writes a short toolbox talk on a topic that matters on this site this week, from the programme, recent near misses or the work starting next.
Turns the accident book entry, statements and photos into a structured investigation report and checks whether and when the accident must be reported under RIDDOR.
Reads the safety data sheets for the products a package uses, such as adhesives, resins and cutting silica, and drafts the COSHH assessment for how your gangs actually use them.
Reads the week's inspection forms and permits from site and keeps the registers, flagging anything overdue or not closed out.
Pulls accidents, near misses, inspections, audit findings and training gaps from every site into one report for the directors.
The contract review, the handover from estimating and the orders.
Compares the contract or subcontract you have been sent with the standard form and with your tender, and lists every amendment and what it changes for you.
Writes the handover pack the contracts manager needs when a job is won: what was priced, what was assumed, what was excluded and what the client was promised.
Works back from the programme to the dates each package must be ordered, approved and delivered, including design approvals and long lead items.
Builds the start-up checklist for a new job from the contract and the pre-construction information, including whether the project is notifiable to HSE and whether it is a higher-risk building.
Writes the narrative that explains the programme you submit for acceptance: the logic, the critical path, the key dates and the assumptions behind them.
Diaries, RFIs, drawings and the report the client reads each month.
Reads the week's diary entries, labour returns and photos and writes the weekly site report, keeping the record of what happened each day.
Drafts each request for information from the site team's notes and photos, and keeps the register of what is open, overdue and answered.
Reads each drawing issue, updates the register and lists what changed from the last revision so site works to the current one.
Writes the monthly report the client or main contractor asks for, from the weekly reports, the programme, the RFI register and the health and safety figures.
Turns the recording or notes of the progress meeting into minutes with an action log, and sends each owner their actions.
Drafts the 2 week look-ahead from the programme, this week's progress and the open RFIs, deliveries and permits.
Instructions, notices and the letters that get extra work paid.
Turns an instruction, whether written, verbal or a revised drawing, into a variation letter that records what changed, when and on whose authority.
Builds the variation quotation from your contract rates, the measured change and any new rates, with the build-up laid out the way the contract asks.
Keeps one register of every instruction, variation, early warning and claim on a job, with its status, value and the date of each step.
Drafts the notice the contract requires when something could cost time or money, such as an NEC early warning or a JCT notice of delay, from the facts on site.
Drafts the quotation for an NEC compensation event, with the changes to defined cost and the effect on the programme set out the way the contract asks.
Reads the signed daywork sheets, prices them at the contract's daywork rates and matches each one to an instruction.
Builds the narrative and the evidence for a claim for more time, linking each delaying event to the programme and to the records made at the time.
Reads a job's emails, minutes, diaries and drawing revisions to find instructions and scope changes that never became a variation.
Builds a dated chronology of a disputed matter from the correspondence, notices and records, for your adviser and for an adjudication if it comes to one.
Applications, payment notices, retention and the final account.
Builds the application for payment from the measured progress, the variations and the materials on site, set out the way the contract asks and submitted on its date.
Compares the payment notice you receive with what you applied for, line by line, and drafts the response to anything cut without a reason.
Keeps a ledger of the retention held on every job and when each part is due back, and drafts the request when a release date passes.
Pulls the contract sum, every variation, dayworks, adjustments and claims into the final account with the evidence for each item.
Reads the aged debt report against each client's payment terms and history and lists who to chase, in order of what is at stake.
Drafts the escalating letters when a sum is unpaid after the final date for payment, from a reminder through to notice of intention to suspend.
Checks each sales and purchase invoice for construction services against the domestic reverse charge rules before it goes out or is posted.
Orders, documents before site, and paying them under CIS.
Drafts each subcontract order from your standard terms, the agreed quote and the main contract, so what you pass down matches what you carry.
Checks what each subcontractor has sent before they start, such as insurances, RAMS, training and cards, and chases what is missing or expired.
Works out each subcontractor's CIS deduction from their invoice and HMRC verification status, and drafts the payment and deduction statements.
Checks each subcontractor's application against progress on site, their order, agreed variations and your own application, and drafts the payment notice.
Brings together each subcontractor's record on a job, from programme and quality to safety and paperwork, into a short rating for your approved list.
Checks open orders against the procurement schedule and the look-ahead, and chases suppliers whose deliveries put the programme at risk.
Snags, O&M manuals and the information the client keeps.
Turns walk-round notes and photos into a snag list sorted by trade and area, and tracks each snag to close-out.
Collects the data sheets, certificates, warranties and as-built drawings for the O&M manual, chases what is missing and assembles it in the client's structure.
Pulls the information from your records that the principal designer needs for the health and safety file, such as residual risks, as-built details and hazardous materials.
Keeps the record of how your work meets the Building Regulations on a higher-risk building, and drafts the concerns you must report to the principal contractor.
Logs each defect the client reports in the defects period, sends it to the right trade and tracks it to close-out and the release of retention.
Who is qualified for what, and what expires next month.
Keeps one record of every operative's cards, tickets and training with expiry dates, and lists what runs out in the next 60 days.
Reads the week's timesheets, checks them against the site diary and allocates the hours to jobs and cost codes before payroll.
Adds up the labour each job needs over the next 8 weeks from the programmes, against the people you employ and the subcontract gangs you can call on.
Writes the job advert and the offer letter for a site or office role from the work it covers, the cards and tickets it needs and the pay you set.
CIS, the monthly cost report, cash and the directors' meeting.
Prepares the monthly CIS return from the month's subcontractor payments and deductions, and checks it before the deadline.
Brings together each job's valuation, costs to date, committed costs and forecast to completion into the monthly cost value reconciliation.
Rolls the cash forecast forward each week from applications due, payment terms, retention, subcontractor payments, payroll and the CIS and VAT dates.
Writes the monthly report for the directors from the CVR, the cash forecast, the order book, the tender list and the safety report.
Fills in the renewal proposal for your contractors' all risks, liability and professional indemnity cover from your turnover, claims, contracts and activities.
Pulls secured work, likely wins and the tender list into a view of turnover and workload for the next 12 months, by month.
A printable checklist of every use case above, with what each one does. Tick the ones that fit, then bring your shortlist to a free 30-minute call with us.
That did not save, so your email is not on our list. The checklist is yours anyway.
Open your checklistNobody has published how many hours a week estimators, quantity surveyors and contracts managers spend on this work, so put in your own.
Costed at £32 an hour. An hour is costed from that salary plus employer National Insurance and pension, over 1,740 hours.
This values the hours at what they cost the business. A day back for an estimator is another tender priced, and a day back for a QS is a variation agreed before the final account, but nobody has published a way to measure either, so we have not put a figure on it.
Not a bigger job. The same job, with the work on the right hand side of that list mostly gone and the time spent on pricing, building and the clients who give you work.
Pick one use case from this page. We will spend 30 minutes on a call with you, with no slides, and you keep whatever we build.
Book a call
Start with the paperwork around the build. Claude can draft the quality answers for a tender from your best past bids, write site specific RAMS from your approved template, turn a site instruction into a variation letter and build the monthly application for payment. Your estimators and contracts managers check each one, price the work and sign it off.
It can draft one, but a person decides the safe way to do the work. Claude drafts the RAMS for a package from your template, the drawings and the construction phase plan. Under CDM 2015 the principal contractor plans, manages and monitors the construction phase, so the contracts manager reads the draft against the site and signs it.
Our estimates are large for the biggest bid documents. A quality submission drops from 16 hours by hand to 3 with Claude, reading an enquiry pack from 2 hours 30 to 25 minutes, and a supplier questionnaire from 3 hours to 30 minutes. Nobody has published measured times, so the calculator on this page uses your own.
Yes, by keeping the paperwork current. Claude drafts the monthly application for payment from measured progress, variations and materials, and checks the payment notice you get line by line. The Construction Act requires a payment notice within 5 days of the due date, stating the sum and how it was worked out. How hard to push is yours.